{"id":21459,"date":"2023-11-07T08:03:44","date_gmt":"2023-11-07T08:03:44","guid":{"rendered":"https:\/\/mup-ibl.com\/?p=21459"},"modified":"2023-11-07T08:03:47","modified_gmt":"2023-11-07T08:03:47","slug":"resume-nach-zwei-erfolgreichen-sanierungsjahren","status":"publish","type":"post","link":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/","title":{"rendered":"Resume after two successful years of reorganisation"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The project for the refurbishment of the site <em>Devil's Heath<\/em> in Osnabr\u00fcck, is a joint, cross-site project within the M&amp;P Group. The development of the concept for groundwater remediation at the site <em>Devil's Heath<\/em>was carried out by M&amp;P Ingenieurgesellschaft at the Osnabr\u00fcck site. The employees at this site were responsible for monitoring the remediation and providing expert advice to the client. The planning, construction and operation of the groundwater remediation plant was carried out by the employees of MuP Umwelttechnik at the Heidelberg site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thanks to regular maintenance appointments and close cooperation between the two M&amp;P sites, a successful refurbishment has now been underway for just over two years. Both parties have grown at this joint plant location as part of this project and have gained a wealth of experience.<br \/>After the first year of operation, MuP Umwelttechnik carried out a plant inspection, checked the condition of the plant and prepared it for further successful long-term operation. In the course of this, further pending measures were also discussed to ensure target-orientated plant operation. For example, a change of activated carbon in the adsorber tanks was planned for a few months later and successfully implemented in close co-operation.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/mup-ibl-com-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1.jpg\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/mup-ibl-com-wordpress.rz.mup-digital.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-768x1024.jpg\" alt=\"\" class=\"wp-image-21461\" style=\"width:500px\" srcset=\"https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-768x1024.jpg 768w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-225x300.jpg 225w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-1152x1536.jpg 1152w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-1536x2048.jpg 1536w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-9x12.jpg 9w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-600x800.jpg 600w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1-150x200.jpg 150w, https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-1-1.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Now, at the end of a second successful year of operation, the success of the refurbishment was evident, among other things, in the removal of oxidation products that had accumulated and had to be disposed of in order to keep the plant running successfully.<br \/>The measure to clean the affected system components was planned in close coordination and collegial, cross-site cooperation and carried out together with regular maintenance work, accompanied by the employees of MuP Umwelttechnik.<br \/>The cleaning measure will maintain the plant's efficient performance status in order to ensure that the groundwater contaminated with pollutants can continue to be purified without disruption in the future.<\/p>","protected":false},"excerpt":{"rendered":"<p>The redevelopment project at the Teufelsheide site in Osnabr\u00fcck is a joint, cross-site project within the M&amp;P Group. The development<\/p>","protected":false},"author":40,"featured_media":21460,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-21459","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&amp;P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&amp;P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Monis Khan\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"MuP Umwelttechnik - Engineering for a Better Tomorrow\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik\" \/>\n\t\t<meta property=\"og:description\" content=\"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&amp;P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&amp;P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-11-07T08:03:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-11-07T08:03:47+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&amp;P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&amp;P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#blogposting\",\"name\":\"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik\",\"headline\":\"Resume nach zwei erfolgreichen Sanierungsjahren\",\"author\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/2023-07-Osnabruck-Bild-2.jpg\",\"width\":1920,\"height\":1440,\"caption\":\"2023 07 Osnabr\\u00fcck Bild 2\"},\"datePublished\":\"2023-11-07T08:03:44+00:00\",\"dateModified\":\"2023-11-07T08:03:47+00:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#webpage\"},\"articleSection\":\"NACHRICHTEN\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/nachrichten\\\/#listItem\",\"name\":\"NACHRICHTEN\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/nachrichten\\\/#listItem\",\"position\":2,\"name\":\"NACHRICHTEN\",\"item\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/nachrichten\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#listItem\",\"name\":\"Resume nach zwei erfolgreichen Sanierungsjahren\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#listItem\",\"position\":3,\"name\":\"Resume nach zwei erfolgreichen Sanierungsjahren\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/nachrichten\\\/#listItem\",\"name\":\"NACHRICHTEN\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\",\"name\":\"MuP Umwelttechnik\",\"description\":\"Engineering for a Better Tomorrow\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/\",\"name\":\"Monis Khan\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/312cee6a4c065614a22491dcc5e43a682007dd61ba48dee5da4bb1c1e30ab8a3?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Monis Khan\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#webpage\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/\",\"name\":\"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik\",\"description\":\"Das Projekt zur Sanierungsma\\u00dfnahme am Standort Teufelsheide in Osnabr\\u00fcck, ist ein gemeinschaftliches, standort\\u00fcbergreifendes Projekt innerhalb der M&P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&P Ingenieurgesellschaft am Standort Osnabr\\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\\u00fcber dem Auftraggeber, angenommen. Die Planung, der\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/2023-07-Osnabruck-Bild-2.jpg\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#mainImage\",\"width\":1920,\"height\":1440,\"caption\":\"2023 07 Osnabr\\u00fcck Bild 2\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/resume-nach-zwei-erfolgreichen-sanierungsjahren\\\/#mainImage\"},\"datePublished\":\"2023-11-07T08:03:44+00:00\",\"dateModified\":\"2023-11-07T08:03:47+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\",\"name\":\"MuP Umwelttechnik\",\"description\":\"Engineering for a Better Tomorrow\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik","description":"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der","canonical_url":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#blogposting","name":"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik","headline":"Resume nach zwei erfolgreichen Sanierungsjahren","author":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"publisher":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-2.jpg","width":1920,"height":1440,"caption":"2023 07 Osnabr\u00fcck Bild 2"},"datePublished":"2023-11-07T08:03:44+00:00","dateModified":"2023-11-07T08:03:47+00:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#webpage"},"isPartOf":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#webpage"},"articleSection":"NACHRICHTEN"},{"@type":"BreadcrumbList","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/umwelttechnik.siera.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/#listItem","name":"NACHRICHTEN"}},{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/#listItem","position":2,"name":"NACHRICHTEN","item":"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/","nextItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#listItem","name":"Resume nach zwei erfolgreichen Sanierungsjahren"},"previousItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#listItem","position":3,"name":"Resume nach zwei erfolgreichen Sanierungsjahren","previousItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/#listItem","name":"NACHRICHTEN"}}]},{"@type":"Organization","@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization","name":"MuP Umwelttechnik","description":"Engineering for a Better Tomorrow","url":"https:\/\/umwelttechnik.siera.com\/en\/"},{"@type":"Person","@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author","url":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/","name":"Monis Khan","image":{"@type":"ImageObject","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/312cee6a4c065614a22491dcc5e43a682007dd61ba48dee5da4bb1c1e30ab8a3?s=96&d=mm&r=g","width":96,"height":96,"caption":"Monis Khan"}},{"@type":"WebPage","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#webpage","url":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/","name":"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik","description":"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#breadcrumblist"},"author":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"creator":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2023\/11\/2023-07-Osnabruck-Bild-2.jpg","@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#mainImage","width":1920,"height":1440,"caption":"2023 07 Osnabr\u00fcck Bild 2"},"primaryImageOfPage":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/#mainImage"},"datePublished":"2023-11-07T08:03:44+00:00","dateModified":"2023-11-07T08:03:47+00:00"},{"@type":"WebSite","@id":"https:\/\/umwelttechnik.siera.com\/en\/#website","url":"https:\/\/umwelttechnik.siera.com\/en\/","name":"MuP Umwelttechnik","description":"Engineering for a Better Tomorrow","inLanguage":"en-GB","publisher":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"MuP Umwelttechnik - Engineering for a Better Tomorrow","og:type":"article","og:title":"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik","og:description":"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&amp;P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&amp;P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der","og:url":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/","article:published_time":"2023-11-07T08:03:44+00:00","article:modified_time":"2023-11-07T08:03:47+00:00","twitter:card":"summary_large_image","twitter:title":"Resume nach zwei erfolgreichen Sanierungsjahren - MuP Umwelttechnik","twitter:description":"Das Projekt zur Sanierungsma\u00dfnahme am Standort Teufelsheide in Osnabr\u00fcck, ist ein gemeinschaftliches, standort\u00fcbergreifendes Projekt innerhalb der M&amp;P Group. Die Entwicklung des Konzepts zur Grundwassersanierung am Standort Teufelsheide, erfolgte durch die M&amp;P Ingenieurgesellschaft am Standort Osnabr\u00fcck. Die Mitarbeiter an diesem Standort haben sich der Sanierungs\u00fcberwachung sowie der fachgutachterlichen Betreuung gegen\u00fcber dem Auftraggeber, angenommen. Die Planung, der"},"aioseo_meta_data":{"post_id":"21459","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-10 09:43:10","updated":"2025-06-11 08:39:44","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/umwelttechnik.siera.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/\" title=\"NACHRICHTEN\">NACHRICHTEN<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tResume nach zwei erfolgreichen Sanierungsjahren\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/umwelttechnik.siera.com\/en\/"},{"label":"NACHRICHTEN","link":"https:\/\/umwelttechnik.siera.com\/en\/category\/nachrichten\/"},{"label":"Resume nach zwei erfolgreichen Sanierungsjahren","link":"https:\/\/umwelttechnik.siera.com\/en\/resume-nach-zwei-erfolgreichen-sanierungsjahren\/"}],"_links":{"self":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/comments?post=21459"}],"version-history":[{"count":1,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21459\/revisions"}],"predecessor-version":[{"id":21462,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21459\/revisions\/21462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/media\/21460"}],"wp:attachment":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/media?parent=21459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/categories?post=21459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/tags?post=21459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}