{"id":21776,"date":"2026-01-30T16:48:05","date_gmt":"2026-01-30T16:48:05","guid":{"rendered":"https:\/\/mup-ibl.com\/?p=21776"},"modified":"2026-02-16T17:02:00","modified_gmt":"2026-02-16T17:02:00","slug":"baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg","status":"publish","type":"post","link":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/","title":{"rendered":"Site clearance for the new Heidelberg Heart Centre"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Technical planning and monitoring by M&amp;P Umwelttechnik<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The new heart centre at Heidelberg University Hospital is one of the most important hospital projects in Germany. With a total investment of around <strong>557 million euros<\/strong>, a usable area of about <strong>22.500 m\u00b2<\/strong> and <strong>235 beds<\/strong> a state-of-the-art, fully digital hospital for cutting-edge cardiological medicine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the run-up to this major project <strong>M&amp;P Umwelttechnik - Member of the SIERA Alliance <\/strong>&nbsp;a central role: the <strong>Planning, monitoring and supervision of the complete site clearance<\/strong>. This demanding task required not only comprehensive technical expertise, but also the utmost sensitivity to the ongoing operation of the clinic.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>The new Heidelberg Heart Centre - a project with exemplary character<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">In future, all areas of modern cardiac medicine will be brought together under one roof in the new heart centre<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Further information on the project and the interplay between medicine, digitalisation and research can be found at<br \/><br \/>\ud83d\udc49 <a href=\"https:\/\/spatenstich.herzzentrum-ukhd.de\/\"><strong>Groundbreaking ceremony for the Heart Centre and Informatics for Life: Heart Centre Heidelberg<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The building is <strong>Fully digital hospital<\/strong> and is designed to set new standards for medical care, research and clinical processes.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Initial situation: A highly complex construction site in the hospital centre<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Before work could begin on the new building, the planned construction site had to be cleared. The initial situation was technically and logistically extremely challenging:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Disused clinic building<\/li>\n\n\n\n<li>Underground supply ducts<\/li>\n\n\n\n<li>Technical installations<\/li>\n\n\n\n<li>a central tower block with <strong>two basement floors<\/strong> and a height of around <strong>55 metres<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed project figures and background information are documented in the official fact sheet:<br \/><br \/>\ud83d\udc49 <a href=\"https:\/\/content.presspage.com\/uploads\/2326\/d3eab989-5dc2-4608-a18b-fd1a576e4505\/faktenblattherzzentrumundifl_2025.pdf?10000\"><strong>251023_HZ_Faktenblatt.indd<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">All existing buildings were located <strong>in the centre of the grounds of Heidelberg University Hospital<\/strong>, surrounded by sensitive functional areas of ongoing hospital operations. Further information on the construction site and the general conditions is available from Heidelberg University Hospital here:<br \/><br \/>\ud83d\udc49 <a href=\"https:\/\/www.klinikum.uni-heidelberg.de\/baugelaende-ukhd\"><strong>UKHD\/baugelaende-ukhd: Heidelberg University Hospital<\/strong><\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Services from M&amp;P Umwelttechnik<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">M&amp;P Umwelttechnik from Heidelberg provided comprehensive support for the project throughout the <strong>Service phases 1-8 of the HOAI<\/strong>. The range of services included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Technical inspections of the existing buildings for pollutants<\/li>\n\n\n\n<li>Planning of site clearance and preparation<\/li>\n\n\n\n<li>Monitoring the dismantling work<\/li>\n\n\n\n<li>Coordination of all environmental and safety-related measures<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This integrated approach ensured that all work was carried out safely, in compliance with regulations and in line with hospital operations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Dismantling under special conditions<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The work to clear and prepare the site took place in <strong>from January 2024 to November 2025<\/strong> took place during the ongoing operations of Heidelberg University Hospital. This placed extraordinary demands on planning and monitoring.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Special challenges at a glance<\/strong><\/h4>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Noise and dust protection<\/strong><br \/>Extensive protective measures were required to ensure that patients, staff and visitors were not affected.<\/li>\n\n\n\n<li><strong>Dismantling next to escape routes<\/strong><br \/>An approximately <strong>15 metre high building<\/strong> had to be dismantled without blocking or relocating an immediately adjacent driveway for emergency vehicles<\/li>\n\n\n\n<li><strong>Aviation law requirements<\/strong><br \/>Due to the neighbouring <strong>Approach path for rescue helicopters<\/strong> special regulations had to be observed when using the long front excavator and crane.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">These framework conditions made precise planning and continuous construction supervision essential.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Technical precision meets responsibility<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The importance of experience and interdisciplinary expertise is particularly evident in projects in the medical environment. M&amp;P Umwelttechnik ensured that:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>all legal and technical requirements have been met<\/li>\n\n\n\n<li>clinic operations were maintained at all times<\/li>\n\n\n\n<li>Safety and environmental risks have been minimised<\/li>\n\n\n\n<li>complex dismantling work was efficiently coordinated<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This project is an example of how environmental technology, construction planning and responsibility can work together in the healthcare sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project milestones at a glance<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Project phase<\/strong><\/td><td><strong>Contents<\/strong><\/td><td><strong>Period<\/strong><\/td><\/tr><\/thead><tbody><tr><td>Technical investigations<\/td><td>Pollutant analyses of the existing buildings<\/td><td>Before project start<\/td><\/tr><tr><td>Planning &amp; authorisation<\/td><td>Site clearance according to HOAI LPH 1-8<\/td><td>2023-2024<\/td><\/tr><tr><td>Dismantling &amp; clearing<\/td><td>Buildings, cellars, installations, supply corridors<\/td><td>Jan 2024 - Nov 2025<\/td><\/tr><tr><td>Symbolic ground-breaking ceremony<\/td><td>Official start of new heart centre construction<\/td><td>Oct 2025<\/td><\/tr><tr><td>Planned patient operation<\/td><td>Commissioning of the heart centre<\/td><td>from 2030<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><br \/><strong>Symbolic ground-breaking ceremony and outlook<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In the <strong>October 2025<\/strong> The official symbolic ground-breaking ceremony for the new heart centre took place on 1 July. With the successful completion of the site clearance, a decisive foundation stone has been laid for the realisation of this medical flagship project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Further background information on the ground-breaking ceremony and the significance of the new building for Heidelberg as a centre for health and research can be found here:<br \/><br \/>\ud83d\udc49 <a href=\"https:\/\/www.klinikum.uni-heidelberg.de\/newsroom\/spatenstich-fuer-smartes-herzzentrum-mit-assoziiertem-forschungsinstitut\/\"><strong>Ground-breaking ceremony for \u201esmart\u201c heart centre with associated research institute<\/strong><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Start of patient operations is planned for 2030<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Heidelberg Heart Centre project impressively demonstrates how technical excellence, precise planning and responsibility towards people and the environment work together. With its work, M&amp;P Umwelttechnik - a member of the SIERA Alliance - is making an important contribution to the creation of a sustainable healthcare infrastructure - in line with the guiding principle:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Engineering For a Better Tomorrow.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Would you like to find out more about complex demolition projects, site clearance in sensitive environments or environmental technology in the healthcare sector?<br \/><br \/>\ud83d\udc49 <strong>Discover more projects from M&amp;P Umwelttechnik - member of the <a href=\"https:\/\/siera.com\/\" title=\"\">SIERA Alliance<\/a> - and find out how engineering makes sustainable solutions possible.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Technical planning and monitoring by M&amp;P Umwelttechnik The new heart centre at Heidelberg University Hospital is one of the most important hospital projects in the world.<\/p>","protected":false},"author":40,"featured_media":21777,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-21776","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Monis Khan\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"MuP Umwelttechnik - Engineering for a Better Tomorrow\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&amp;P Umwelttechnik\" \/>\n\t\t<meta property=\"og:description\" content=\"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-01-30T16:48:05+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-16T17:02:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&amp;P Umwelttechnik\" \/>\n\t\t<meta name=\"twitter:description\" content=\"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#blogposting\",\"name\":\"Baufeldber\\u00e4umung Herzzentrum Heidelberg | M&P Umwelttechnik\",\"headline\":\"Baufeldber\\u00e4umung f\\u00fcr das neue Herzzentrum Heidelberg\",\"author\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Blog-Post-2-3.jpg\",\"width\":1250,\"height\":600},\"datePublished\":\"2026-01-30T16:48:05+00:00\",\"dateModified\":\"2026-02-16T17:02:00+00:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#webpage\"},\"articleSection\":\"Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/uncategorized\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#listItem\",\"name\":\"Baufeldber\\u00e4umung f\\u00fcr das neue Herzzentrum Heidelberg\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#listItem\",\"position\":3,\"name\":\"Baufeldber\\u00e4umung f\\u00fcr das neue Herzzentrum Heidelberg\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/category\\\/uncategorized\\\/#listItem\",\"name\":\"Uncategorized\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\",\"name\":\"MuP Umwelttechnik\",\"description\":\"Engineering for a Better Tomorrow\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/\",\"name\":\"Monis Khan\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/312cee6a4c065614a22491dcc5e43a682007dd61ba48dee5da4bb1c1e30ab8a3?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Monis Khan\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#webpage\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/\",\"name\":\"Baufeldber\\u00e4umung Herzzentrum Heidelberg | M&P Umwelttechnik\",\"description\":\"M&P Umwelttechnik begleitet die Baufeldber\\u00e4umung f\\u00fcr das neue Herzzentrum Heidelberg \\u2013 komplexe R\\u00fcckbauarbeiten im sensiblen Klinikbetrieb.\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/author\\\/Monis Khan\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Blog-Post-2-3.jpg\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#mainImage\",\"width\":1250,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\\\/#mainImage\"},\"datePublished\":\"2026-01-30T16:48:05+00:00\",\"dateModified\":\"2026-02-16T17:02:00+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/\",\"name\":\"MuP Umwelttechnik\",\"description\":\"Engineering for a Better Tomorrow\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/umwelttechnik.siera.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&P Umwelttechnik","description":"M&P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.","canonical_url":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#blogposting","name":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&P Umwelttechnik","headline":"Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg","author":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"publisher":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2026\/01\/Blog-Post-2-3.jpg","width":1250,"height":600},"datePublished":"2026-01-30T16:48:05+00:00","dateModified":"2026-02-16T17:02:00+00:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#webpage"},"isPartOf":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#webpage"},"articleSection":"Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/umwelttechnik.siera.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/#listItem","name":"Uncategorized"}},{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/#listItem","position":2,"name":"Uncategorized","item":"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/","nextItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#listItem","name":"Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg"},"previousItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#listItem","position":3,"name":"Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg","previousItem":{"@type":"ListItem","@id":"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/#listItem","name":"Uncategorized"}}]},{"@type":"Organization","@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization","name":"MuP Umwelttechnik","description":"Engineering for a Better Tomorrow","url":"https:\/\/umwelttechnik.siera.com\/en\/"},{"@type":"Person","@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author","url":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/","name":"Monis Khan","image":{"@type":"ImageObject","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/312cee6a4c065614a22491dcc5e43a682007dd61ba48dee5da4bb1c1e30ab8a3?s=96&d=mm&r=g","width":96,"height":96,"caption":"Monis Khan"}},{"@type":"WebPage","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#webpage","url":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/","name":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&P Umwelttechnik","description":"M&P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#breadcrumblist"},"author":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"creator":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/author\/Monis Khan\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/umwelttechnik.siera.com\/wp-content\/uploads\/2026\/01\/Blog-Post-2-3.jpg","@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#mainImage","width":1250,"height":600},"primaryImageOfPage":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/#mainImage"},"datePublished":"2026-01-30T16:48:05+00:00","dateModified":"2026-02-16T17:02:00+00:00"},{"@type":"WebSite","@id":"https:\/\/umwelttechnik.siera.com\/en\/#website","url":"https:\/\/umwelttechnik.siera.com\/en\/","name":"MuP Umwelttechnik","description":"Engineering for a Better Tomorrow","inLanguage":"en-GB","publisher":{"@id":"https:\/\/umwelttechnik.siera.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"MuP Umwelttechnik - Engineering for a Better Tomorrow","og:type":"article","og:title":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&amp;P Umwelttechnik","og:description":"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.","og:url":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/","article:published_time":"2026-01-30T16:48:05+00:00","article:modified_time":"2026-02-16T17:02:00+00:00","twitter:card":"summary_large_image","twitter:title":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&amp;P Umwelttechnik","twitter:description":"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb."},"aioseo_meta_data":{"post_id":"21776","title":"Baufeldber\u00e4umung Herzzentrum Heidelberg | M&amp;P Umwelttechnik","description":"M&amp;P Umwelttechnik begleitet die Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg \u2013 komplexe R\u00fcckbauarbeiten im sensiblen Klinikbetrieb.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-01-30 16:48:06","updated":"2026-02-16 17:05:04","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/umwelttechnik.siera.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/\" title=\"Uncategorized\">Uncategorized<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBaufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/umwelttechnik.siera.com\/en\/"},{"label":"Uncategorized","link":"https:\/\/umwelttechnik.siera.com\/en\/category\/uncategorized\/"},{"label":"Baufeldber\u00e4umung f\u00fcr das neue Herzzentrum Heidelberg","link":"https:\/\/umwelttechnik.siera.com\/en\/baufeldberaeumung-fuer-das-neue-herzzentrum-heidelberg\/"}],"_links":{"self":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/comments?post=21776"}],"version-history":[{"count":4,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21776\/revisions"}],"predecessor-version":[{"id":21792,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/posts\/21776\/revisions\/21792"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/media\/21777"}],"wp:attachment":[{"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/media?parent=21776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/categories?post=21776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/umwelttechnik.siera.com\/en\/wp-json\/wp\/v2\/tags?post=21776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}